A used equipment pre-start review is needed when a second-hand machine with safeguarding devices or interlocked guards goes into an Ontario factory, because no exemption covers used equipment as such. Expect a documentation gap review: the engineer rebuilds missing information, checks the guarding against current requirements and lists the changes needed before start-up.
Auction purchases, dealer rebuilds and machines brought in from a plant that closed account for most of these reviews. The buyer is usually a small or mid-sized manufacturer trying to save on capital, and the review is where some of that saving goes. A used equipment pre-start review covers the same ground as a new machine's, plus the hours it takes to rebuild the paperwork that didn't travel with it.
Why a used machine needs its own review
Picture a press brake bought at an auction in another province. It ran for fifteen years, it has a light curtain, and the seller says it "passed its PSR." None of that helps much once it's on your floor.
Section 7(2) applies when an apparatus or protective element is to be added or installed in your factory. The law doesn't care whether it's new from the factory or ten owners old. The ministry's flow chart asks one question: is it new or newly installed in this workplace? A used machine arriving at your plant is newly installed.
There's also no shortcut through the old paperwork. The current section 7 has no exemption for used equipment, none for equipment previously reviewed elsewhere, and none for equipment with a CSA or ULC listing. The guideline's relocation rule (no review needed for a move) only applies within the same workplace, and only when the move brings no triggering changes. A seller's PSR was written for the seller's layout, guarding and operators, not yours.
Which items apply depends on the equipment. Most used-equipment questions are about machine guarding under Item 2, but used racking (Item 3) and used cranes or vehicle lifts (Item 7) raise the same problem: the exemption needs documents that rarely travel with second-hand gear. See the racking review page and the lifting devices page for those. A used curing oven or dip tank is normally an Item 4 review for ignition and explosion risk when solvents are involved, and a second-hand dust collector handling combustible dust falls under the Item 5 dust collector rules, which have no exemption at all. A used furnace for a melt shop is a foundry and metal production question under Item 6.
Where the exemption usually falls apart
The Item 2 exemption needs three things to line up. The machine and its protective elements must be manufactured to, or modified to meet, current applicable standards. They must be installed to those standards, if any, and the manufacturer's instructions. And you need documents showing both: a manufacturer's certificate or purchase records naming the standards, plus the installer's written statement.
Used machines tend to fail on the documents. The manual is missing, the declaration of conformity went with the last owner, and nobody can produce a statement from the original installer because you're the installer now. Without the documents, Flow Chart 1 is blunt: a PSR is required.
Age adds a second problem. A machine built before the standards on the ministry's list existed wasn't manufactured to them. It can still qualify if it was modified to meet them, but that takes evidence, and producing it usually amounts to a review anyway.
What changes in the review
The legal requirements are the same as for a new machine. The work is different in two ways.
Rebuilding the documentation
On a new machine the engineer starts from the builder's drawings, safety-circuit schematics and device data sheets. On a used one, those often have to be recreated from the machine: tracing safety wiring, identifying safety relays and interlock switches from their labels, measuring guard openings and distances, and timing how fast the machine actually stops. Stopping time matters because it sets how far a light curtain has to sit from the hazard.
Closing the gap to current standards
The engineer then compares what's there with the guarding sections of Reg. 851 and the standards that apply today. Older machines commonly turn up guards with openings too large for their distance from the hazard, interlocks that can be defeated with a magnet or a spare actuator, single-channel safety circuits (a safety circuit PL check shows how far short those fall), and light curtains mounted where a hand can reach the hazard before the machine stops. The report lists the measures to fix each one before start-up.
Refurbished and rebuilt machines
The guideline separates maintenance, which restores equipment to its original design, from modification, which changes it from that design. A dealer rebuild with identical parts is maintenance. A rebuild that adds a new safety PLC, swaps a two-hand control for a light curtain or changes the guarding layout is a modification, and the review covers those changes. Ask the dealer for a written list of what was replaced.
Electrical approval
A separate rule applies to the electrics. Ontario's Product Safety regulation, O. Reg. 438/07, says no one may use an electrical product unless it's approved, which in practice means a recognized certification mark or a field evaluation label. A used machine from outside Canada, or one rewired along the way, may need a field evaluation before it's connected. That isn't part of the PSR, but it often runs alongside it. If the machine is going into a solvent area, its motors and controls also have to be approved and marked for the zone on your area classification drawings.
What it does to the cost
A used machine review usually costs more than the same machine new, for one reason: hours spent reconstructing information that a new machine would have shipped with. The fewer documents you can supply, the wider the estimate, because the engineer can't tell how much tracing and measuring is needed until they see the machine. Machines needing a field evaluation add a second, separate fee. To see where a used machine sits against new equipment and the other items, compare it with typical pre-start review fees for new equipment.
The estimator on this page starts with the used condition already selected. Change the equipment type and device answers to match your machine.
| Situation | Typical engineering fee |
|---|---|
| Used standalone machine, few or no documents | $7,100 – $9,500 + HST |
| Used standalone machine, full documents | $6,100 – $7,200 + HST |
| Used press brake, few or no documents | $9,200 – $12,400 + HST |
| Used press brake, full documents | $8,000 – $9,300 + HST |
| Used robot cell | $10,600 – $12,500 + HST |
| Used racking without load data | $6,800 – $8,000 + HST |
| Relocated bridge crane (design review) | $5,700 – $6,600 + HST |
Engineering fees before HST, worked out by the same calculator as the estimator: GTA, full documentation and standard timing unless the row says otherwise. They're estimates, not quotes; the firm confirms its fee after reviewing your documents.
How to keep a used machine review under control
- Ask before you bid. Request the manual, electrical and safety-circuit drawings, the declaration of conformity or manufacturer's certificate, and any previous PSR. Missing documents are a cost you can price into your offer.
- Photograph the nameplates. The machine plate, safety relays, light curtains and interlock switches tell the engineer the model and age of each safety part.
- Talk to an engineer before the machine ships. A short desk review of photos and the manual can show whether the guarding is close to compliant or needs a redesign.
- Don't run it to see if it works. The review has to be done before operation, and the guideline includes testing and commissioning in that. An inspector who finds it running without a review can write an order under the OHSA, and may also require a sealed not likely to endanger report on the machine.
- Keep the dealer's rebuild list. It decides whether the machine is maintained or modified.
The list of what to have ready for the engineer puts the documents in order. If the machine is a European import, the CE equipment page explains how a declaration of conformity is treated. If you're unsure, check whether section 7 applies to your change or read the exemption summary for all eight items.
Questions people ask
Does a used machine need a PSR in Ontario?
Yes, when installing it in your factory brings in a Table circumstance, such as a light curtain or an interlocked guard under Item 2. Section 7 has no exemption for used equipment. The only way to skip the review is a Table exemption backed by documents, which used machines rarely come with.
Does auction equipment need a PSR before startup?
Auction equipment is treated like any other machine being installed, so the review has to be done before it's operated, including test runs and commissioning. Auction lots often arrive without manuals or a declaration of conformity, which rules out the exemption route. Plan the review into the time between the hammer falling and the first production run.
Is a refurbished machine 'modified'?
It depends on what was done. The ministry guideline calls work that restores equipment to its original design maintenance, and work that changes it from its original design, such as fitting a part with different specifications, a modification. A rebuild with new safety controls or a different guarding layout is a modification; a rebuild with identical parts is not.
Does a used machine keep its old PSR?
Not when it moves to a new workplace. Section 7 has no exemption for equipment reviewed elsewhere, and the guideline's relocation rule only covers moves within the same workplace. The seller's report is still useful background for the engineer, so ask for it.
Does a used machine need electrical approval as well as a PSR?
Often. O. Reg. 438/07 bars using an electrical product that isn't approved, which in practice means a recognized certification mark or a field evaluation label. A used machine from outside Canada, or one rewired by a previous owner, may need a field evaluation before it's connected, and that is separate work from the pre-start review.