For one machine in the GTA with good documents, a pre-start review usually costs $3,800 to $4,500 + HST. Racking and flammable liquids reviews cost a little more, explosion hazards and cranes more again, and a foundry is the largest job. Travel, missing documents and rush or Ministry of Labour deadlines add to the fee.

These figures are calculated, not collected: each pre-start review cost in Ontario shown here comes from the same hours model as the estimator and is recalculated each time the site is built. The model adds engineering hours for document review, the site visit, analysis and the report, at $250 an hour, then travel and any disbursements. None of it is a quote, and none of it is copied from another firm's price list.

Fees by Table item

The table compares one typical job and one larger job for each item in the section 7 Table. Every row comes from the same estimator you can use beside this page, with the GTA, full documentation and standard timing, so the items line up against each other.

Pre-start review fees by Table item
Table itemTypical jobLarger or more complex job
Item 1: Flammable liquids $4,400 – $5,200Dispensing room$6,200 – $7,300Tank storage with pumped dispensing
Item 2: Machine safeguarding $3,800 – $4,500One standalone machine$8,300 – $9,800Robot cell with light curtains and interlocks
Item 3: Racking $4,050 – $4,750Selective racking, 100 to 1,000 positions$9,800 – $11,500Drive-in racking over 10 m, partial load data
Item 4: Ignition or explosion risk $7,200 – $8,400Solvent mixing room$13,700 – $16,000Hydrogen system in two or three areas
Item 5: Dust collectors $4,150 – $4,900Outdoor collector, 5,000 to 20,000 CFM, wood dust$6,400 – $7,500Large indoor metal-dust collector
Item 6: Foundries $12,900 – $15,200Induction furnace with ladles and cranes$21,600 – $25,300Steel production, two or three furnaces
Item 7: Cranes, hoists and vehicle lifts $5,200 – $6,100Bridge crane, 5 to 20 t, design review only$6,600 – $7,700Bridge crane with load test witnessed by the firm
Item 8: Ventilation $6,500 – $7,700Local exhaust for solvent vapours$10,800 – $12,600Designated substance, two or three systems

Engineering fees before HST, worked out by the same calculator as the estimator: GTA, full documentation and standard timing unless the row says otherwise. They're estimates, not quotes; the firm confirms its fee after reviewing your documents.

The spread inside an item usually comes down to size and complexity rather than the item itself: a robot cell takes twice the engineering of a single guarded machine, and a high-bay drive-in system takes more than double a modest selective rack line. Each item page lists more cases for its own equipment, for example machine guarding review fees and racking review fees.

What moves the fee

A firm prices a pre-start review from the hours it expects to spend, so anything that adds hours or trips adds cost:

  • Size and number. More machines, devices, rack positions or process areas mean more site time, more analysis and a longer report.
  • Documentation. Missing manuals, drawings or supplier letters mean the engineer works things out from the equipment itself, which is why a review of a second-hand machine often costs more.
  • Location. Travel is charged from the nearest engineering hub, and the far north means a flight.
  • Timing. A visit within a week, or a Ministry of Labour compliance date, means the firm moves other work.
  • Disbursements. Lab tests on dust samples, or test weights when you ask the firm to run a crane load test, are added at cost.

Where you are in Ontario

For most of southern Ontario, travel changes the fee by a few hundred dollars. Drive time is billed at $160 an hour and mileage at the Canada Revenue Agency rate of $0.73 a kilometre, from Toronto, Ottawa, London or Sudbury, whichever is closest. Northwestern Ontario is different: the estimate assumes a flight, a hotel night and a rental car.

The same job in different parts of Ontario
RegionOne machine (Item 2)Racking line (Item 3)
GTA (Toronto, Peel, York, Durham, Halton) $3,800 – $4,500$4,050 – $4,750
Hamilton and Niagara $4,100 – $4,800$4,300 – $5,000
London, Sarnia, Windsor $4,200 – $4,900$4,400 – $5,200
Barrie, Simcoe, Muskoka $4,400 – $5,200$4,600 – $5,400
Peterborough, Kingston, Belleville $4,500 – $5,300$4,700 – $5,500
Ottawa and Eastern Ontario $3,900 – $4,600$4,100 – $4,800
Sudbury, North Bay, Sault Ste. Marie $4,350 – $5,100$4,550 – $5,300
Thunder Bay and Northwestern Ontario $6,300 – $7,400$6,500 – $7,700

Engineering fees before HST, worked out by the same calculator as the estimator: GTA, full documentation and standard timing unless the row says otherwise. They're estimates, not quotes; the firm confirms its fee after reviewing your documents.

Rush timing and Ministry of Labour deadlines

Booking a visit within a week adds about 20% to the fee, and working to a Ministry of Labour compliance date adds about 35%, because the firm has to drop other work to meet the date. If an inspector has already issued an order, what to do after a Ministry of Labour order covers the first steps and the reports that usually close it.

Standard timing, rush and Ministry of Labour deadlines
TimingOne machine (Item 2)Racking line (Item 3)Dispensing room (Item 1)
Standard (2 to 4 weeks) $3,800 – $4,500$4,050 – $4,750$4,400 – $5,200
Within a week $4,600 – $5,400$4,850 – $5,700$5,300 – $6,200
Ministry of Labour order deadline $5,200 – $6,100$5,400 – $6,400$5,900 – $7,000

Engineering fees before HST, worked out by the same calculator as the estimator: GTA, full documentation and standard timing unless the row says otherwise. They're estimates, not quotes; the firm confirms its fee after reviewing your documents.

The cheapest way to avoid both is to book the review when the purchase order goes out. The guideline treats the review as a design review, so it can be done before installation.

What missing documents cost

When some documents are missing, the fee rises by about 10%. With little or no documentation it rises by about 25%, and the range widens, because nobody knows yet how much the engineer will have to reconstruct.

How documentation changes the fee
DocumentationOne machine (Item 2)Dispensing room (Item 1)Bridge crane, design review (Item 7)
Full documentation $3,800 – $4,500$4,400 – $5,200$5,200 – $6,100
Some documents missing $4,200 – $4,950$4,850 – $5,700$5,700 – $6,700
Little or no documentation $4,450 – $5,900$5,100 – $6,800$6,000 – $8,100

Engineering fees before HST, worked out by the same calculator as the estimator: GTA, full documentation and standard timing unless the row says otherwise. They're estimates, not quotes; the firm confirms its fee after reviewing your documents.

Most of that is avoidable. The documents to collect before the engineer's visit are the same ones that keep a quote at the low end.

Exemption reviews cost less

Several items have an exemption that applies when you hold the right documents. An engineer can check those documents and confirm the exemption in writing, without a site visit, for a fraction of a full review. If the exemption doesn't hold, you're back to the full review.

Exemption reviews compared with a full review
ExemptionEngineer's exemption reviewFull review if it doesn't hold
Machine guarding made and installed to current standards $1,150 – $1,350$3,800 – $4,500
Flammable liquids in approved cabinets only, no dispensing $900 – $1,100$3,150 – $3,700
Whole rack system designed and tested to ANSI MH16.1 $1,250 – $1,500$4,050 – $4,750
Spray booth made to current standards, nothing inside $900 – $1,100$7,600 – $8,900
Certified vehicle lift $900 – $1,100$1,750 – $2,050
Crane on a structure designed for it $1,150 – $1,350$5,200 – $6,100
Portable extractor that doesn't exhaust outdoors $800 – $950$6,500 – $7,700

Engineering fees before HST, worked out by the same calculator as the estimator: GTA, full documentation and standard timing unless the row says otherwise. They're estimates, not quotes; the firm confirms its fee after reviewing your documents.

The conditions and the documents each exemption needs are set out in the exemptions for all eight items. A CE or CSA mark alone isn't one of them, and a machine imported with only a CE mark usually needs extra review time.

What's usually extra

  • The changes the report asks for, such as new guarding, ventilation work or rack repairs.
  • A return visit to check those changes, if you want one.
  • Separate services the review may point to, such as area classification drawings or a Performance Level assessment of the safety controls.
  • Lab testing and test weights, unless they're part of what you asked the firm to do.
  • HST, which every figure on this page excludes.

Getting a firm quote

Use the estimator for a range that fits your own equipment, location and timing. We contact you to confirm the scope, and the engineering firm doing the review confirms its fee after looking at your documents, before any work starts. If you're still deciding whether a review applies at all, start with the eight section 7 items.

Questions people ask

How much does a PSR cost in Ontario?

A full review runs from about $1,750 + HST for a single vehicle hoist to about $25,300 + HST for steel production with two or three furnaces. The common cases are $3,800 to $4,500 + HST for one guarded machine, $4,050 to $4,750 + HST for a selective rack line and $5,200 to $6,100 + HST for a bridge crane design review, all in the GTA.

Why do two firms quote different fees for the same review?

Each firm prices its own hours. One may plan a longer site visit, count travel from a different office, or assume it will have to rebuild missing drawings. Ask each firm what its quote includes: the site visit, the sealed report, a load test, a return visit after the changes.

How much more does a rush pre-start review cost?

About 20% more for a visit within a week, and about 35% more when the work has to meet a Ministry of Labour compliance date. Booking when the purchase order goes out avoids both.

Is an exemption review cheaper than a full review?

Yes. Confirming an exemption is a document review with no site visit, so it usually costs $800 to $1,500 + HST. If the documents don't support the exemption, a full review is needed after all.

Are the figures on this page quotes?

No. They're estimates from a model of typical Ontario engineering fees. The firm that takes on the work confirms its fee after looking at your documents, and that confirmed fee is the one that applies.