CE marking on its own isn't accepted in Canada as proof that a machine can be used in an Ontario factory. Section 7 exemptions need documents naming the standards met, and electrical equipment needs an approval recognized by the Electrical Safety Authority. Imported CE-only machines usually need a pre-start review with a gap review.

The usual buyer is an Ontario manufacturer ordering a food-processing or metalworking machine from a European builder, often against a tight start-up date. The machine shows up with paperwork that works well in Europe and only partly here, so it pays to find out early whether CE marking is accepted in Canada for the two things that decide start-up: the pre-start review and electrical approval.

Is CE marking accepted in Canada? Two separate questions

A packaging machine arrives from Italy with a CE plate, a thick manual and a one-page declaration of conformity. The plant manager wants it running by month end. Two Ontario rules apply, and the CE mark answers neither.

The first is the pre-start review under section 7 of Reg. 851. If the machine uses light curtains, area scanners, safety mats, two-hand controls or interlocked guards, it falls under Item 2, machine guarding. It needs a review before it runs, unless a documented exemption applies.

The second is electrical approval. Ontario's Product Safety regulation, O. Reg. 438/07, says no one may use, sell or display an electrical product unless it's approved. A product is deemed approved if it carries the mark of a certification body accredited by the Standards Council of Canada and recognized by ESA, or a label from an accredited field evaluation agency. ESA publishes its list of recognized approval marks, and CE isn't on it.

The ministry guideline is just as direct about the safety side: CSA, ANSI and CE markings "do not indicate that the product meets the requirements of the Industrial Establishments Regulation." Origin doesn't matter either way. The guideline says it makes no difference whether equipment was bought in Canada or abroad; the question is whether it meets the current applicable standards.

Outside Ontario, the question is the same in substance. Manitoba's electrical code, for example, repeats Canadian Electrical Code Rule 2-024: electrical equipment "shall be approved", and Manitoba Hydro's note on Rule 2-024 explains that approved equipment carries the mark of an acceptable certification organization or inspection body. A CE mark isn't one of those marks. For a machine going to another province, ask the engineer which approval route that province accepts.

When a CE declaration supports the exemption

The Item 2 guideline accepts an EU declaration of conformity as exemption evidence under strict conditions. It must state that the machine complies with the Machinery Directive 2006/42/EC, and it must explicitly list the standards used to get there. Those standards have to be current applicable standards on the ministry's list.

From 20 January 2027, machinery placed on the EU market is declared to the EU Machinery Regulation (EU) 2023/1230 instead. The guideline still refers to the Directive, so ask the engineer how a declaration citing the Regulation is read; the test is the same: it must name the standards used.

Standards marked with an asterisk on that list are accepted outright, among them ISO 12100, ISO 13857, ISO 14119, ISO 14120 and IEC 61496-1 and -2. Standards on the second list, which includes the European machine-specific standards and ISO 13855, need an engineer's assessment before they support an exemption. ISO 13849, the control-circuit performance level standard that European declarations often cite, isn't on either list.

The declaration is only half the file. The exemption also needs the machine installed to current applicable standards, if any, and the manufacturer's instructions, with a written statement from the installer saying so. A declaration that doesn't cite specific standards, the guideline says twice, is not acceptable.

CE marking vs CSA certification

People often compare the two marks as if one replaces the other. They answer different questions.

CE marking compared with a CSA (or other ESA-recognized) certification mark, for a machine installed in an Ontario factory
QuestionCE markingCSA or other recognized certification mark
What it signalsThe manufacturer declares compliance with the applicable EU directivesAn accredited certification body has certified the product to Canadian standards for use in Canada
Electrical approval in Ontario (O. Reg. 438/07)No; not on ESA's recognized listYes, if the mark is on ESA's recognized list and covers the whole product, not just components
Exempts the machine from an Item 2 PSR by itselfNoNo
Can support the Item 2 exemptionThe declaration can, if it names standards on the ministry's list, plus the installer's statementOnly with a manufacturer's document naming the guarding standards met, plus the installer's statement
Typical guarding standards behind itHarmonized EN ISO standards (ISO 12100, ISO 13857, ISO 14119)The mark itself is usually about electrical safety; guarding evidence comes separately, for example to CSA Z432
Installation in OntarioOntario Electrical Safety Code and ESA inspection still applyOntario Electrical Safety Code and ESA inspection still apply

What changes in the review for a CE machine

The legal test is the same as for any machine. The extra work sits in the gap review.

First, the engineer reads the declaration and the technical file you have, and sorts the standards into three piles: accepted outright, acceptable with engineering assessment, and not on the list. Then the machine is checked against the guarding sections of Reg. 851. European machines are often built to a high standard, so the findings tend to be specific: a reset button reachable from inside the guarded zone, an interlock type that doesn't match the ministry-listed standard, or a safety distance calculated for a different stopping time than the machine actually achieves.

The electrical side runs in parallel. If the control panel or the machine as a whole lacks a recognized Canadian mark, it needs a field evaluation before it's used. Panel-only field evaluation labels cover the panel, not equipment connected to it, so check what the label actually covers. Supply voltage and frequency differences between Europe and Ontario also get looked at during installation. A machine going into a solvent area also needs motors and sensors approved and marked for the zone on the plant's hazardous location drawings.

Where the declaration relies on ISO 13849 for the safety circuits, you may need those circuits verified separately. The page on performance level assessment for safety circuits explains when that's worth doing.

What it does to the cost

A CE-only machine usually costs more to review than an equivalent machine supplied with Canadian documentation, because of the gap review: extra desk time on the declaration and technical file, more analysis, and a longer report. A field evaluation, if needed, is a separate fee from a separate provider. The estimator on this page starts with the imported CE condition selected. For the fee of the same machine with Canadian documents, see the Ontario PSR fee comparison by item.

Starting the machine before the review is done costs more again. An inspector can issue a compliance order and may require an engineer's s.54(1)(k) report on the machine.

Example fees: imported CE machine PSR
SituationTypical engineering fee
CE-only standalone machine $6,600 – $7,700 + HST
CE-only packaging line or palletizer $9,800 – $11,500 + HST
Same standalone machine with full documentation, for comparison $3,800 – $4,500 + HST

Engineering fees before HST, worked out by the same calculator as the estimator: GTA, standard timing. They're estimates, not quotes. A field evaluation of the electrical equipment, where one is needed, is a separate fee from the evaluation body and isn't included.

How to reduce it before the machine ships

  1. Write the documents into the purchase order: a declaration of conformity that lists every standard applied, the full manual in English, electrical and safety-circuit drawings, and device data sheets with response times.
  2. Ask the builder to design to standards on the ministry's asterisked list where they have a choice, and to state the editions.
  3. Require a recognized Canadian certification mark on the electrical equipment, or arrange the field evaluation before delivery.
  4. Have an engineer review the layout and safety concept at the design stage. A PSR is meant to be a design review before installation, and changes are cheaper on paper than on the floor.
  5. Line up the installer's written statement as part of the installation contract.

The same thinking applies beyond machine guarding. Racking imported from overseas needs documents showing it was designed and tested to ANSI MH16.1-2012 (R2019) before it can use the Item 3 racking exemption, and an imported vehicle hoist needs certification to ANSI/ALI ALCTV-2011 for the Item 7 lifting device exemption. A CE mark doesn't help an imported dust collector either, since Item 5 collector reviews have no exemption in the Table.

If the import is second-hand, read the used equipment PSR page too. You can check whether you need a PSR by answering the ministry's flow chart questions, which also walk through the exemption conditions, or start from the section 7 Table overview.

Questions people ask

Is CE marking accepted in Canada?

Not as a substitute for Canadian requirements. In Ontario, the ministry guideline says a CE, CSA or ANSI mark doesn't exempt equipment from a pre-start review, and electrical products must carry a recognized certification mark or field evaluation label to be approved for use. A CE declaration that lists specific standards can still be useful evidence.

Does Canada require CE marking?

No. CE is a European marking, and nothing in Ontario's pre-start review or electrical approval rules asks for it. What Ontario asks for is electrical approval under O. Reg. 438/07 and, where a Table circumstance applies, a pre-start review or a documented exemption.

Does a CE declaration of conformity exempt a machine from a PSR?

Only when it explicitly lists the standards used to comply with the EU Machinery Directive, those standards are current applicable standards on the ministry's Item 2 list, and you also have the installer's written statement. The guideline says a declaration that doesn't cite specific standards is not acceptable. If the listed standards aren't on the asterisked list, an engineer has to assess them.

Do imported machines also need CSA field evaluation?

If the machine's electrical equipment doesn't carry a certification mark that ESA recognizes, it needs to be approved another way before use, usually by field evaluation from an accredited agency that applies a label. Field evaluation and the pre-start review are separate pieces of work under separate laws. CSA Group is one accredited body, but not the only one.

What is the Canadian equivalent of CE?

There isn't a single one. For electrical safety, the closest match is a certification mark from a body accredited by the Standards Council of Canada and recognized by ESA, such as CSA, or a field evaluation label. For guarding, Ontario relies on the section 7 review or a documented exemption rather than a mark.